Day: October 7, 2021

Containerized waste incinerator is our most recent design for market. This incinerator is build in ISO container before leave factory. After consumer received container, install the chimney and connect with electric power and setup oil tank, that is all. Now, the burning capacity can be 30 kgs/50kgs/100kgs per hour for ISO 20′feet container. This moveable/mobile […]