Month: February 2022

HICLOVER Top Feeding Door Waste Incinerators ▲▲▲Large Feeding Door ▲▲▲Better for Animal Waste Cremation ▲▲▲HICLOVER Brand Section ***Primary Combustion Chamber ***Secondary Combustion Chamber ***Smoke Filter Chamber ***Optional Wet Scrubber System(1 section or  3 sections) Phone: +86-13813931455(whatsapp/wechat)Website: http://www.clovereps.com/  Email: [email protected]Email: [email protected]   Nanjing Clover Medical Technology Co.,Ltd. Items Side Loading Door Top Loading Door Cost Cheap High cost Manufacture Tech. Easy A litter difficult […]
I desire to get back in a lot more technical details e.g. gas use for. Blazing 100/200 kg of animal items daily as well as additionally the FOB. Cost of the unit.The kinds of waste to be dealt with are (following EUROPEAN WASTE PAMPHLETS AND ALSO CONTAMINATED PRODUCTS CHECKLIST, 2002): 18 01 01 sharps (other […]
Hospital Waste Management in Addition to Competitive costs as Pakistan is a competitive market. We have a complete setup with Office, Client Relations, Import / Export, Biomedical Department, Application Support Department & Project Designing Department.Description        Minimum Requirements Length Dimensions: Description or grate/hearth    A full hearth supplied to stop contaminated liquids from flowing into the […]
Resources Of The Wastes. Advanced gas treatment system to avoid discharge of dangerous gases (massaging system). x). Made use of cotton fabrics. r). Slurry/adhesive/grease/ powder coating wastes. Heater for healthcare facility waste surveillance with the sticking to features: – – In high temperatures( pyrolytic burner two chambers with temperatures varying from 950 º C to […]
Layout CA-200 Picture Burning Rate Regular 100 kgs/hour Key Burning Chamber 2000 Liters Extra Burning Smokeshaft Yes Feed Setting Guidebook Voltage 220V Power 3.0 Kw Gas Kind Diesel Oil Heater Italy Original Oil Use (Diesel Oil) Normal 53 kg/hour Interior Dimensions 230 x 100 x 90cm (key chamber) External Dimensions 290 x 200 x 170cm […]
30kgs rate 60kgs feed oil and gas burner small waste incinerator for Afghanistan Machine Working mode Oil or Gas + Power Voltage 220V Oil consumption (lit/hour) Typical 13.3lit/hour/chamber Gas consumption (NG) (m3/hour) 16.0 (m3/hour) (NG) Gas consumption (LPG) (m3/hour) 11.7 (m3/hour) (LPG) Burning rate Typical 30kg/hour Feed mode Manual Primary Combustion chamber 360 Liters Secondary Combustion […]
Items/Model TS500( PLC) Photo Principle Waste Incineration Therapy Melt Rate 150-200 kg/hour Control Setting PLC( Programmable Reasoning Control Heater) Combustion Chamber 2700L Inside Dimensions 190x120x120cm Second Chamber 1300L Smoke Filter Chamber Yes Feed Setting Guide Voltage 220V Oil Intake (kg/hour) Common 28 Gas Use (m3/hour) *** Temperature Show Digital Show Temperature Level Safety And Security […]
Items/Model TS100( PLC) Image Concept Waste Incineration Treatment Shed Rate 60-80 kg/hour Control Setting PLC( Programmable Reasoning Controller Burner) Burning Chamber 1200L Inside Measurements 120x100x100cm Second Chamber 600L Smoke Filter Chamber Yes( Dry Scrubber) Feed Establishing Guide Voltage 220V Oil Utilization (kg/hour) Common 20.4 Gas Consumption (m3/hour) *** Temperature Level Monitor Digital Present Temperature Level […]
Items/Model TS50( PLC) Image Principle Strong Waste Incineration Burn Price 30-45 kg/hour Control Mode PLC( Programmable Reasoning Control Heater) Burning Chamber 560L Inner Measurements 100x80x70cm Secondary Chamber 280L Smoke Filter Chamber Yes Feed Establishing Manual Voltage 220V Oil Consumption (kg/hour) Frequent 13.3 Gas Intake (m3/hour) *** Temperature Level Screen Digital Show Temperature Level Degree Protection […]
1. N95 and Disposable Mask Machine   2. 400mm and 1600mm Melt blown Production Line 3. ES Fiber Production Line       N95 Face Mask Machine Production Line Melt blown Production Line   A.)Optional Ability: 1600mm Efficiency: 95-97percent FOB Term Cost: USD per pair Price Valid: 5days. Ave.60 Days prepared for shipping. In stock […]
Model CA100 Picture Waste Therapy Medical Waste Incineration Treatment Feed Capacity Ordinary 100-200 kgs per feed Burning Price Typical 100-120 kgs per human resources Burning Time per Feed Criterion 1-2 hr Control Placing PLC( Programmable Reasoning Controller Incinerator) Voltage 220V Power 1.0 Kw Gas Diesel oil Burner Italy Heater Feed Mode Handbook Temperature Level Monitor […]
We are china incinerator manufacturer, contractor and exporter. Manufacturer make reasonable price for incinerator customer, supply medical incinerator, hospital incinerator, animal incinerators, hog incinerators, pet cremation equipment, small incinerator, pet incinerator, animal incinerator, portable incinerator, small animal incinerator, infectious waste pyrolysis machine, laboratory incinerator. HICLOVER help customer reduce purchase budget, custom made function, quality products […]
N95 Face Mask Machine Production Line on Sale Now! $250,000USD per set N95 Face Mask Machine Production Line on Sale Now! l Dimension(L*W*H): 1037*855*1780 l Power Supply 15.3kw mono phase l Net Weight: approx.: 1500kg HICLOVER – Medical Environmental    WWW.HICLOVER.COM Waste Incinerators Medical Waste Incinerator Pet Animal Cremation Solid Waste Incinerator Tel:  +86-25-8461 0201    Mobile: +86-13813931455(whatsapp/wechat)Website: www.clovereps.com  Email: [email protected]Email: [email protected]   Nanjing Clover Medical Technology Co.,Ltd.   2020-04-10
of primary and secondary air? 7. Is it possible to have an automatic bottom ash unloading system? 9. Is it possible to have an automatic bottom ash unloading system? 6. Does it provide for management interventions to correct waste feed, grate speed, and temperature, quantity and supply of primary and secondary air? 5. Does this […]
平面口罩机参数: Semi-Automatic Mask Machine l Power supply: 3.3KW mono Stage l Mask Size: 175mm*80-100mm (two or three layers) l Nonwoven (GMS): 10-50g l Capacity: 120 to 150pcs/min l Dimension(L*W*H):3800mm*500mm*1400mm l Net Weight: Approximately 1000kg   焊接机参数: Welding Machine l Capacity: 5 to 10pcs/min l Power supply: 8.5KW mono Stage l Compressed Air connection: 0.5 to 0.7Mpa l Dimension(L*W*H): 900mm*650mm*1380mm l Net weight: approx. 50kg   KN95口罩机参数: N95 Mask Machine […]
Dual heat burners and dual chamber incinerator Burning capacity up to 30 Kg per hour Main Product List Primary Combustion Chamber(Main body stainless steel) Secondary Combustion Chamber(Main body stainless steel) Mix-Combustion Chamber Wet Scrubber( Washing Tower)(Main body stainless steel) Incinerator Control Case Chimney:5.0Meters  Stainless Steel Italy gas burner: 02 sets Oil Tank (if oil fuel): […]
Burning rate: 250 Kg/hr. It should be able to Operate not Less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… Design Specification: Types A, B, C, D, and E of medical waste “PYROLYTIC” combustion, by controlling the gasification of waste. The incinerator […]
This equipment quality structural for kinds of site, like hospital, environmental department,  animal cremation agencies, etc.  HICLOVER Incinerator supply updated models with dual combustion chamber,  mix-combustion chamber and smoke filter  chamber with refractory lines, and the combustion chamber temperature up to 1200 deg C. Equipment Technical Specifications Model YD-10C Picture Feed Capacity Typical 40 kgs […]
Temperature Level Show & & & & PLC Control Instance Main Burning Chamber Incinerator Text ***Primary Combustion Chamber Italy Oil/Gas Heating Unit ***Chimney:10.0Meters *** 2nd Burning Chamber *** Smoke Filter Chamber ***Italy oil/gas burner: 02 units ***Oil Tank (if oil fuel): 200Liters *** Heater PLC Control Circumstances Items/Model TS100( PLC) Principle Waste Incineration Therapy Melt Cost […]
Waste Burner (Containerized Mobile Heater) Ability: Normal 50 kgs per human resources Style CA50 Interior Dimensions 100 x 80 x 70 centimeters Main Product Listing Main Burning Chamber Added Burning Chamber Smoke Filter Chamber Heater Control Situation Smokeshaft:5.0 Meters *( upgrade to Stainless-steel, cost-free rate) Italy oil/gas heater: 02 systems Oil Container (if petroleum gasoline […]
Model TS30 oil fired waste small incinerator 30kgs/hr. Items/Model TS30( PLC) Picture Melt Price Average 20-30 kg/hour Feed Capacity Regular 60kg per feeding Control Establishing PLC( Programmable Thinking Controller Incinerator) Burning Chamber 330L Inner Measurements 75x75x60cm Secondary Chamber 180L Smoke Filter Chamber Yes Feed Establishing Manual Feeding Voltage 220V Power 0.5 Kw Oil Utilization (kg/hour) […]
Waste Incinerator Model TS150 PLC, Overview Construction is dual/double combustion chamber with 02 sets oil burner, batch load  incineration equipment. Waste feed chamber is 1570Liters (1.57m3, TS150 PLC).  Primary & Secondary combustion chambers and smoke filter chamber.  Batch load on the bottom of chamber. Incinerator PLC panel control suit for local operation. Primary Combustion Chamber:  […]
Key Features: — — — — Complete selection burner with Saved money Tiny Scale burner, Standard Small-Large Range heater, General Municipal Solid Waste Heater, Family members Pet dog and likewise Pet Cremation, Containerized Mobile Burner, High Effective Environmental Waste Burner. — Single combustion chamber, double combustion chambers, three combustion chambers and  multi-combustion chambers waste incinerators. […]
*** 3 sets Burners *** Good for animals or big pets *** Double Combustion chamber *** stainless steel chimney *** Italy made oil burners *** 1200Liters(1.2m3) big chamber Burner for Pet Crematory Pig Cattle Ranch Variation A1200 Version A1200 Picture Burning Price Common 50 kgs/hour Feed Ability Requirement 100 kgs/feeding Key Combustion Chamber 1200 Liters […]
*** Primary combustion chamber & secondary combustion chamber *** Smoke filter chamber(dry scrubber) *** stainless steel chimney *** PLC auto. control *** Italy made oil or gas burner(diesel oil/natural gas/lpg) *** temperature display and control *** high temperature firebrick,etc Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 […]
*** Double Combustion Chamber *** PLC auto control operation *** stainless steel chimney *** smoke filter chamber *** Italy oil/gas burner *** whole design, mini. installation working *** cheaper cost *** long lifetime design *** better material and spare parts 2020-02-10 *( upgrade to Stainless Steel, free price) Italy oil/gas burner: 02 collections Oil Container […]
Presently, we supply different series for local customer requirements and design  updated incinerator with our leading technology. The updated design feature  of our range of incinerators make them one of the most cost effective in the world. Key Features: * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long lifetime.  * High temperature, long lifetime of incinerator. * Free or minimum installation on site. * High burn rate, from 10kgs to 600kgs per hour, up to 10ton per day. * PLC Control Plane for Intelligent operation.  * New Design for pet animal cremation business. * One year warranty on incinerator and parts in stock. It features unique and advanced merits with compact size, high burning effect,  reasonable burning technology, high degree of non-harm etc.It is an ideal  choice for waste treatment of hospitals, hotels and various areas. Features: (5)   Compact structure and small land occupation. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. (1)   Gasifiedpyrolysis incineration is used for burning many Types of waste. Mobile: +86-13813931455(whatsapp/wechat)Website: www.clovereps.com  Email: [email protected]Email: [email protected]   Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg […]
Smallest waste incinerator for small hospital  average 10kgs per hour.  with double(2) sets burner. Tools Technical Specifications Version YD-10 Feed Capability Average 20 kgs per feed Burning Cost Regular 10 kgs per hour Burning Time per Feed 2 humans resources Voltage 220V Gas Diesel oil Heater Italy Heater Feed Establishing Guidebook Gas consumption (Oil) 5.4-12.6 […]
Merchandise Specification Variation YD-30C (client made version) Main Product List Main Burning Chamber( Text stainless-steel) Second Combustion Chamber( Main body stainless steel) Mix-Combustion Chamber Damp Scrubber( Washing Tower)( Text stainless-steel) Incinerator Control Instance Smokeshaft:5.0 Meters *( update to Stainless Steel, cost-free cost) Italy heater: 02 systems Oil Container (if petroleum fuel): 100Liters Style YD-30C Feed […]
Primary chamber:Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.Secondary Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.Third Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.Integrated dual flu gas washer: Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.Chimney:Heavy duty 5mm or more stainless steel casing mild steel casing.Stack cap/spark arrestors.Control Panel:a.Temperature Monitoring with 4 digit display.b.Thermostat control device for burner (fuel saver)c.Temperature control 0-12 hours.d.Integral fan timer control
Primary chamber:Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.Secondary Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.Third Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.Integrated dual flu gas washer: Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.Chimney:Heavy duty 5mm or more stainless steel casing mild steel casing.Stack cap/spark arrestors.Control Panel:a.Temperature Monitoring with 4 digit display.b.Thermostat control device for burner (fuel saver)c.Temperature control 0-12 hours.d.Integral fan timer control
Model A1500 (customer made layout ) Interior Measurements 150 x 100 x 96cm Acceptable For Family Pet Feline – – – – yes – Pet pet – yes – Pig – yes Cow – no Secret Thing Listing Primary Combustion Chamber Second Burning Chamber Mix-Combustion Chamber Damp Scrubber( Laundering Tower)( Optional Part) Incinerator Control Circumstance […]
It is an auto reader for Bacillus Stearothermophilus to test the spore discharge after treatment (sterilization) of (G) Technical Specifications of Spore tester Features and Specifications: should be a very Accurate, reliable and easy-to-use units for reading rapid readout biological indicators (RRBI) for the waste. Automatically reads indicator results. There should be red plus (+) […]
Key Product Checklist Main Burning Chamber Additional Combustion Chamber Mix-Combustion Chamber Smoke Filter Chamber Incinerator Control Circumstance Smokeshaft:5.0 Meters *( update to Stainless Steel, free cost) Italy oil burner: 02 collections Oil Storage Tank: 150Liters Mobile Trailer for Incinerator Version YD-50C Burning Price (kgs/Hour) Average 20-50 kgs/hour Feed Ability (kgs) Typical 80 kgs/feeding Instruments Weight […]
We complete this job in year 2010 to 2011 and distribution to Hochiminh port, Vietnam with 1×× 40′ feet open leading full container. Chimney Type 257x147x108 Primary Chamber (Liters) (adsbygoogle = window.adsbygoogle || []).push({}); 500 kgs/Hr. 1000℃-1200℃ 4000 Residency Time YES Items/Model 800 kgs Medical Environmental  1500 Secondary Chamber (Liters) Oil/Gas 14{ (adsbygoogle = window.adsbygoogle […]
TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals   All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice […]
There are 03 sets Design YD-100 circulation to Iraq between year 2013 to 2014. The heater use for neighborhood a range of structure in addition to construction sites along with all gas type is diesel oil. Items/Model YD-100 Burning Rate (kgs/Hour) 100 kgs/Hr. Feed Capacity (kgs) 200 kgs Equipment Weight 5300 kgs Primary Chamber (Liters) […]
Documents to be submitted as following; Fabricators accreditations Test report to prove ZERO harmful emission level provided as samples form other installations Test report to prove sterility achieved at 6log to 10 level to be provided upon commissioning report and validation.   Technical proposal include: The hospital should provide the necessary space: building & infrastructure, […]
2nd Chamber (Liters). Items/Model 1000 ℃ -1200 ℃. UNDOUBTEDLY. Mix-Combustion Chamber. 30 kgs/Hr. 200. Outdoors Dimensions (cm). 100x60x60. INDEED. Smoke Filter Chamber. 145x90x175. Inside Measurements (centimeters). Stainless-steel. Additional Chamber. 60 kgs. Tools Weight. Heater Design YD-30 for Australia Melbourne client. 5. Chimney Kind. CERTAINLY. Combustion Fuel. 2.0 Sec. Temperature level Tracking. YES. First. Chmaber Temperature […]
news from: http://www.chinadaily.com.cn/a/202002/01/WS5e347a86a310128217273ead.html  THAT proclaims split constitutes global public wellness emergency China guaranteed on Friday to work with the global community to support regional as well as also global wellness safety, and also repeated it has the positive self-image as well as also capability to win the fight versus the one-of-a-kind coronavirus outbreak, which has in […]
News from: https://www.thestar.com.my/news/nation/2020/01/26/wuhan-virus-china-mobilises-medical-teams-to-fight-new-coronavirus  WUHAN (Bernama): China is mobilising medical staff to aid Wuhan, the centre of the novel coronavirus (2019-nCoV) outbreak, as the country reported 830 confirmed cases of pneumonia, caused by the virus and 25 deaths by the end of Thursday (Jan 23). By Thursday midnight, Hubei Province in central China reported 549 cumulative confirmed […]
———————————–   Failure to establish the authenticity of the certificate the bidder is liable to render the bid non-responsive and bidder open to action in the line with applicable regulations and act. Original catalogue must be submitted Original data sheet must be submitted   Solidifier (Fluid waste disposal Product) Particular Features of Solidifier 21b jar […]
50kgs per hour incinerator with two chambers suppliers from china *Aveage 50kgs per hour *Double chamber and double burner *900liters primary combustion chamber *Italy burner *Stainless steel chimney Variation YD-50 Burning Cost Average 50 kgs/hour Feed Ability Typical 150 kgs Primary Burning Chamber 900 Litres Additional Combustion Chamber 300 Litres Mix Burning Chamber Yes Smoke […]
30kgs per hour(average) medical waste incinerator, design dual  combustion chambers(primary chamber and secondary chamber),  smoke filter chamber, PLC auto. control system, 0.33m3(330liters) primary combustion chamber, italy oil or gas fuel burner. for small  hospital medical waste treatment. Buy waste incinerator, find hiclover Items/Model TS30 PLC Idea Waste Incineration Burn Rate Criterion 30kgs/hour Gas Kind Diesel Oil/Natural […]
1) Policy – Waste disposal management shall be taken special note to reduce hospital infection. – Infections wastes shall be managed, stored strictly and burnt by a incinerator located at hospital website.   2) Waste Disposal Plan a)Classification – Medical wastes in hospital are classified as follows;   Infections Waste Specially-controlled waste Organ, needle, etc. Industrial waste […]
Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door Things Side Loading Door Top Loading Door Suggestion Price Cheap High cost Manufacture Tech. Easy A clutter tough Safty safe a lot more secure Burner Creating L/ I L Filling up hands-on huge door can be by Forklift Land project little big Ash door exact […]
The incinerator shall be equipped with water injection nozzle link. If the temperature in the primary chamber should rise too high (normal temperature between 300 and 800? C) during the working time, the automated water injection shall be actuated to decease the temperature.   The incinerator shall have the following features and facilities:-   a-    […]
The incinerator shall be supplied with a range of interconnecting ductwork between the thermal reactor outlet and the inlet of the chimney. This ductwork will consist of refractory lined tubes and higher temperature resistant tubes made from rolled sheet steel of minimum 3mm thickness, welded along the length.   The standard chimney shall be made […]
“PYROLYTIC” combustion, by controlling the gasification of waste The incinerator manufacturer must prevent the discharge of black smoke and fine dust, during the loadings. It shall have the ability to reduce the quantity of wastes by 98%. It shall have the ability to hold emission in the second burn with gas residence of not less […]