4. The Service provider shall offer in addition to fully comply with all needs from the associated authority during design stage, layout authorization, assessment and after evaluation, handing over of the system bundle whether it’s clearly shown or otherwise yet considered needed for successful conclusion in addition to contentment to the authority. The Contractor must acknowledge his tender price all direct and indirect cost at no extra cost to the Client for such conformities.7.
20. City in addition to country of use: Australia.
The Professional will supply a Cremation System bundle for TWO (02) Cremators and system authorized by related authority, which need to suit the alloted area as shown on the plan drawings. The work will include however not limited to make prep work, authority layout consent, supply, fabricate, construct, appointing, testing, operational approval, provide training in addition to additionally support warranty of the system bundle. The job will include all preliminaries, related civil and also structural work, mechanical and also electric job in addition to all outside job required for the proper completion in addition to operational of the machine and as adheres to: The incinerator will certainly be used for a team of personal multi profile medical facilities.
The hourly-generated waste has to do with 100kg per hour, however with 1000kg daily quantity.
As a result of the financial circumstance in Bulgaria currently, our researches shows that a 100kg/hour system can match the needs set in the job.
Please, offer us an Incinerator system that can match the parameters described above. We prepare to supply details that’s more comprehensive if you need such one. Within the specialized requirements of you thing we need to have complete details of the specifications of exhaust gases, together with all certificates you have regarding the environmental safety regarding EU directives.
1. All preliminaries which will consist of but not limited to offering job insurance policies, taxes, mobilisation and demobilisation, agreement administration and guidance, layout and also expert charge, authority fashion acceptance, operational approval, site prep work, momentary storage, health and health environmental safety and safety and safety, setting out, CIDB levy, responsibilities, deposits, fees, fees, payment yet not leaving out just the bank guarantee to the authority JPP which will be offered by the Client, development coverage and also other called for preliminaries for successful conclusion of the work.This kind of burner is what you have actually described as a ‘‘ reduced temperature thermal disintegration incinerator’. We can accelerate the burning procedure by using warm air from a downstream process which may be fed back right to the incinerator to elevate the burning temperature.
15. Accessibility of power along with kind: Electric energy if called for
8.
22. Any sort of other details requirements: Main burning chamber just is required. Strong and ignitable waste products need to be together with the ability of being retrieved from the incinerator quickly utilizing an automated treatment. This is due to the fact that the incinerator will certainly be called to operate 24/7. Rotating kiln or moving flooring might be considered if believed sensible by the distributor. One initial incinerator is needed for a proof of thought task and future orders for the successful vendor, following successful implementation of the project, are likely to be considerable.
12. Regional incinerator functioning and also discharge standards: India/ EURO/ US-EPA Australia
23. It would be most valuable if the provider might send out a video of the incinerator in operation or layouts in addition to photos to show how it works.
5. The Professional will be in control of upkeep of the system, regular and periodical maintenance such as cleaning up etc. during, upon completion, prior to and after examination. The maintenance will be in fully conformity to the authority needs in addition to fulfillment and shall be deemed included in the Specialist tender price in addition to at no extra cost to the Client.
6. The Contractor should send to the S.O their proposed system plan detail, that includes authority authorization and an A4 or A3 preliminary dimensioned system layout fitting into place allocated in the plan drawing.
7. For maintenance and solutions during Problem Liability Duration, respond period to any type of criticism for the Contractor to participate in shall be within 24hours
8. The Cremators plan will, inter alia, inclusive the complying with scope:
– – Heating System Chamber and also Afterburner
– – Burning System
– – Control Board
– – Solitary refactory lined chimney for 2 cremators
– – Flue Gas Tasting Platform
– – Electrical circuitry within the system needs
– – Raking Tools
– – Ashbox
– – Authorization from DOE/ Regional Authority
– – Any other scope/works needed for the systems
2. All architectural, building in addition to architectural work that includes not limited to building and construction of all enhanced concrete project, smokeshaft, structural steel job in addition to all building work for all needed requirements, operational and control panel system for correct conclusion in addition to successful procedure of the syste. The Service provider must make great all of the jobs being disturbed.We desire a very basic, solitary combustion chamber, burner which can burning all sorts of waste in addition to rubbish items. We’ll certainly be dealing with the discharges from the burner in a different procedure so we do not need to have scrubbing up or other cleansing devices to reduce pollution.
14. Gas urged to be made use of: LDO/ HSD/ FO/ SKO/ Gas/ Other – – No gas known as – Meant to cost-free melt waste products
17. Do you require an automated loading system? : [X] Yes [] No.
13. What’s the height of the smokeshaft required? Flue length Should be approximately 2-3 metres to connect to a downstream process
The burner is needed to operate 24/7 constantly so it needs to be able to be cleaned whilst still running. The waste materials being spilled will have non flammable products and these will need to be cleaned out of the burner. We would certainly enjoy this cleansing to be as basic as possible. The same applies to the loading of rubbish into the burner, and that we would love to be able to be carried out automatically if possible.
3. All mechanical and also eletrical jobs which includes yet limited to supply, deliver in addition to installation of valves, penstock, screens, pumps, float swithces, adaptable adapter, stress pipeline functions, blower, hot dipped galvanised lifting davits, air diffusers, hot dipped galvanised handrailings, warm dipped galvanized gratings, button boards, cabling and also wirings, illumination, earthing, metering, lighting protection, flow measurement in addition to flow recorders, analyzing & & comissioning and all essential for proper conclusion and powerful operational of the system
OVERALL REACHED COLLECTION
Layout in addition to Create approved gas cremation system.
21. Whether the area is a coastal area: [] Yes [X] No.
18. : [] Yes [X] No.
9. Amount of waste produced each day in kg: 3 -5 tonnes daily
10. Period– incinerator will be used per day: 1– 8 hours/ 1– 16 hrs/ Constant