PROGRESSED MEDICALWASTE HEATER

Smokeshaft.
1 year Spare Parts Package for complete maintainability.
Gas Diesel/LPG/LNG, please reveal.
Burn Price 150kg/h minimal.
Weight (kg), please recommend:.
Wonderful deal 6– – Mobile Burner.
The minimal leave speed of the discharges shall not be less than 10 metres/second;

Temperature Level Warnings.
HTW Mobile Burner style G.
1 year Spare Components Package for complete maintainability.
Fuel Diesel/LPG/LNG, please suggest.
Item 14 10m Hose pipeline Pipe, suggest size.
dimension. Item 19 1000 Litre Gas Storage Tank + Pipeline System, show quantity.
Weight (kg), please indicate:.
Minimum working temperature level 920 ° C, please indicate.
Point 9 Incinerator design C.
Additional Chamber.
The gas temperature degree as determined versus the inside wall surface area in the second room, not in the flame location, will not be a great deal less than as received Lots 1-7;.
Second Chamber.
Burn Rate 65kg/h minimal.
Merchandise 10 10m Tube pipeline Pipeline, show span.
10m Pipeline Pipeline, show size.
Gas Retention Time – – – – two Secs. Power Supply – for – Control Box – 220V-240V 50Hz lone stage.
Gas – Diesel/LPG/LNG, please program. Power Supply for – Control Box – 220V-240V 50Hz single point. Minimum operating temperature level 850 ° C, please program. 1 year Spare Parts Bundle for complete maintainability. Merchandise 18 10m Hose pipe Pipeline, reveal
Burn Rate 250kg/h minimal.
Control box can be gotten rid of in addition to put on different stand at least 1.5 meters from incinerator at approximately 1.6 meter elevation;

Great Deal 2.
Gas Retention Time – – – – two Secs. Gas – Diesel/LPG/LNG, please suggest –. Power Supply – for – Control Box – 220V-240V 50Hz solitary phase. Minimum running temperature level 850 ° C, please recommend. 1 year Spare Components Plan for full maintainability.
& & Country Issues, or European Union regulations and guidelines.

Thing 17 Mobile Burner version E.
Weight (kg), please suggest:.
1 year Spare Parts Package for complete maintainability.
Power Supply for Control Box – – – – 220V-240V 50Hz singular phase.
Superior deal 5– – Mobile Burner. 2. Incinerator gives 2 room incineration along with holds gasses for at least 2 seconds.
Diesel/LPG/LNG, please suggest.
1000 Litre Gas Storage Tank + Pipeline System, suggest volume

Additional Chamber.
Item 11 I000 Litre Gas Container + Pipeline System, indicate quantity.
3. Each incinerator should have appropriate labelling for parts/areas of top job health and wellness threat on the incinerator.
(adsbygoogle = window.adsbygoogle || []).push({});
2nd Chamber.
Warranty, reveal no of years.
Included chimney expansion, suggest altitude. Guarantee, indicate no of years. The minimum combustion temperature degree of the main room will certainly not be less than 800 degrees C;

Second combustion.
Burn Price 100kg/h minimal.

Item 15 1000 Litre Gas Tank + Pipeline System, disclose amount.
When the secondary temperature drops to detailed below the required temperature level;

General, a noticeable and/or different alarm system to encourage the motorist.
Fuel – Diesel/LPG/LNG, please reveal.
The smokeshaft will have a marginal elevation of 4 meters above ground degree;.
Solution guarantee, show no of years.
Burn Price – – – – 150kg/hour minimal. Weight( kg), please show:.
Item 21 Mobile Burner layout F.
Extra Chamber.
Item 6 10m Tube pipe Pipeline, indicate dimension.
Item 22 10m Hose pipe Pipe, show size.
Weight (kg), please suggest:.
Power Supply for Control Box 220V-240V 50Hz single point.
Power Supply for Control Box 220V-240V, solitary phase 50-60Hz.
Weight (kg), please show:.
Minimum running temperature level 1200 ° C, please reveal.
Extra Chamber.
Burn Price 100kg/h minimal.
1 year Spare Components Bundle for complete maintainability.
The residence time in the second room will not be much less than two seconds;.
Second Chamber.
I000 Litre Gas Container+ Pipeline System, reveal amount.
Merchandise 16 Additional smokeshaft development, reveal altitude.
Minimum running temperature level 1200 ° C, please suggest.
Point 23 1000 Litre Gas Tank + Pipeline System, recommend quantity.
Item 20 Extra chimney expansion, suggest height.
Item 7 I000 Litre Gas Tank + Pipeline System, suggest quantity.
Large amount 3.|
Weight (kg), please indicate:.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
Second Chamber.
Power Supply for Control Box – – – – 220V-240V 50Hz singular phase.
Merchandise 16 Additional smokeshaft development, reveal altitude.
Power Supply for Control Box 220V-240V 50Hz single point.
Point 9 Incinerator design C.
Weight (kg), please show:.
10m Pipeline Pipeline, show size.
Wonderful deal 6– – Mobile Burner.
Solution guarantee, show no of years.
Burn Rate 65kg/h minimal.
Item 21 Mobile Burner layout F.
Second Chamber.
1 year Spare Parts Package for complete maintainability.
3. Each incinerator should have appropriate labelling for parts/areas of top job health and wellness threat on the incinerator.
Item 7 I000 Litre Gas Tank + Pipeline System, suggest quantity.
I000 Litre Gas Container+ Pipeline System, reveal amount.
The residence time in the second room will not be much less than two seconds;.
1 year Spare Parts Package for complete maintainability.
Merchandise 10 10m Tube pipeline Pipeline, show span.
Power Supply for Control Box 220V-240V, solitary phase 50-60Hz.
Additional Chamber.
Additional Chamber.
Burn Price 100kg/h minimal.

Categories: