|
Thing |
Specification |
Model |
YD-30C (client made version) |
Main Product Checklist |
Primary Burning Chamber( Text stainless-steel) |
|
Secondary Combustion Chamber( Main body stainless steel) |
|
Mix-Combustion Chamber |
|
Damp Scrubber( Washing Tower)( Text stainless-steel) |
|
Incinerator Control Case Smokeshaft:5.0 Meters |
|
*( Update to Stainless Steel, cost-free expense) |
|
Italy burner: 02 systems |
Oil Container (if oil fuel): 100Liters |
Layout |
YD-30C |
Feed Capability |
Ordinary 50 kgs per feeding |
Burning Rate |
Typical 30 kgs per hour |
Burning Time per Feed |
2 hours |
Voltage |
220V/380V |
Power |
6 Kw |
Gas |
Gas |
Burner |
Italy Burner |
Feed Mode |
Handbook |
Fuel usage (Oil) |
10.2-20.0 Kgs/Hour |
Fuel usage (Gas) |
12.2-24.0 m3/Hour |
Exterior Measurements |
170 x 140 x 190cm (text) |
Internal Measurements |
55 x 55 x 85cm( Main Chamber) |
Waste burning chamber |
250Liters |
Message Combustion Chamber |
140Liters |
Oil Tank Capability |
100 Litres |
Door Opening |
38 x 48cm |
Chimney |
5.0 M |
Gross Weight |
3300kgs |
Chamber Product |
Refractory Concrete |
Max. |
200,000 Kcal/Hr. |
|
Procedure Technical Specs |
Solid Chamber temperature |
8000C -10000 C |
Concentration camp temperature level |
10000C -12000 C |
Chamber Anti-Rate |
13500C |
Residency time |
2.0 Sec. |
Burning effectiveness |
> 98 percent |
Waste Lower Calorific Power |
3000Kcal
Tel: +86-25-8461 0201
Website: www.clovereps.com
Email: [email protected]
Email: [email protected]